ACTIVITY 1B
1. Open your activity 1A and do the following.
2. Select Save As under the File menu and change the name to
(last name) activity 1B.
3. Select save.
4. In the footer change
the date and the activity to 1B.
5. Select the text in the
body and change it to 12 point.
6. Change the body line
spacing to 1 1/2 spaces.
7. Change some of the
text in the body by changing key words to:
8. Create a Hanging Paragraph (1/2 inch on both the right and left margins").